Trade fixtures

A plumbing fixture spec-packet checklist for remodels

A fixture spec packet is the set of documents that lets the buyer, designer, cabinetmaker, and installer work from the same product choices. Build the packet for your actual order, with model and finish identifiers alongside the drawings. For a Los Angeles remodel where a supplier, fabricator, and installation crew may each be working from a separate quote, name one person to maintain the current version.

Make a fixture register

Give each fixture a job reference, such as K01 for the main kitchen sink. Next to it, record the manufacturer, full model and finish code, room, required quantity, and document date. Identify the expected mounting method and note whether a trim, drain, rough-in component, or kit must be ordered separately. Decide who can approve a substitution before anyone requests alternatives.

Write down the holders of the three decisions that follow the fixture choice. The buyer checks the order and included components, the cabinetmaker or countertop fabricator checks the product drawings against the plan, and the installer confirms how the specified unit and compatible accessories come together. Assign individuals for the project, since team configurations vary.

  • One register row per approved fixture, plus a linked list of dependent parts.
  • One open-questions cell per row with an owner and due date.
  • One read-only copy of each approved issue of the packet.

Save documents by exact model number

Collect the current spec sheet, installation instructions, and any relevant parts diagram or template. ALFI Trade publishes an AB3318HS drawing for a reversible fireclay sink. Delta’s product support pages explain how to obtain model-specific installation documents and parts diagrams. These publications illustrate two useful document types, the dimensioned fixture drawing and the numbered assembly list.

Save the public document link with a local copy and record when you checked it. A spec sheet helps you compare dimensions and mounting options. Installation instructions help the appropriate trade understand the parts and sequence. A template search or an accessory list may turn up files covering several models, so ask the manufacturer or fabricator to confirm which file matches the actual unit.

Worked example for a one-sink change

Suppose a job packet contains K01 for a fireclay apron-front sink, K02 for the drain, and K03 for the faucet. The buyer proposes a replacement sink after a delivery date changes. Mark K01 as awaiting approval and include both model identifiers, the source of the proposed replacement, and the date the decision is due. Keep the original files available for comparison.

Send the substitute drawing to the cabinetmaker, the drain and bowl documentation to the installer, and the new included-parts list to the buyer. Ask each person which dependent line items need a second look. If the cutout file changes, mark the prior file superseded in the register, then issue a single packet update so the fabrication team can match its file to the approved unit.

Close the packet before irreversible work

Review the open questions together. Confirm the model and finish on the delivered carton, the usability of the current template, and whether the requested dimensions have been checked against the actual product. Keep pending details visible until the relevant person has signed off.

Use the same register during handoff. Save the product and care information for the person who will use the fixture, plus the ordering reference for whoever handles replacements. The register should make it easy to identify the installed item after the cardboard packaging has been discarded.